
Calistoga Microgrid Studies and Testing
Calistoga Microgrid Studies and Testing
Objective
Demonstrate reliable islanded microgrid operation and protection coordination for a multi-resource system integrating BESS, fuel cells, and behind-the-meter PV on a 12 kV distribution feeder.
Approach
- Conduct microgrid islanding studies (MIS), including black start and load restoration.
- Perform effective grounding and protection coordination analysis.
- Evaluate power quality, harmonics, and transient stability.
- Execute CHIL testing of the protection system
in island mode. - Conduct CHIL testing of the microgrid controller
in island mode.
Results
- Validated black start and load restoration capability.
- Optimized grounding and protection settings for islanded operation.
- Verified controller and protection system performance through CHIL testing.
- Reduced field deployment risk through advanced laboratory validation.
- Enabled resilient microgrid operation for community-scale deployment.

Contact us to learn more about microgrid studies and testing