California sunrise scenery

Calistoga Microgrid Studies and Testing

Calistoga Microgrid Studies and Testing

 

Objective

Demonstrate reliable islanded microgrid operation and protection coordination for a multi-resource system integrating BESS, fuel cells, and behind-the-meter PV on a 12 kV distribution feeder.

 

Approach

  • Conduct microgrid islanding studies (MIS), including black start and load restoration.
  • Perform effective grounding and protection coordination analysis.
  • Evaluate power quality, harmonics, and transient stability.
  • Execute CHIL testing of the protection system
    in island mode.
  • Conduct CHIL testing of the microgrid controller
    in island mode.

 

Results

  • Validated black start and load restoration capability.
  • Optimized grounding and protection settings for islanded operation.
  • Verified controller and protection system performance through CHIL testing.
  • Reduced field deployment risk through advanced laboratory validation.
  • Enabled resilient microgrid operation for community-scale deployment.
Calistoga microgrid map with border.

Contact us to learn more about microgrid studies and testing