Field Testing of Energy Storage
Battery energy storage Overview
Danovo Energy Solutions provides services for the development and implementation of BESS installations, including commissioning and testing services. Our experts are actively participating in and leading the development of industry standards and recommended practices for energy storage systems with IEEE, Cigre, IEC, and local jurisdictions (NERC/FERC/NFPA, etc.). These activities, combined with our hands-on experience with some of the largest BESS projects to date, enable our utility clients to save time and budget and avoid risks to achieve successful projects.
Battery Energy Storage – Design, Engineering, and Tests
In recent years, there has been a growing focus on battery energy storage system (BESS) deployment by utilities and developers across the world and, more specifically, in North America. The BESS projects have certainly moved beyond pilot demonstration and are currently an integral part of T&D capacity and reliability planning program (also referred to as non-wires alternatives [NWAs]). Other key applications are for energy and ancillary service markets, which require a high degree of performance guarantee and availability. All of this emphasizes the need for detailed design, proper engineering, and careful implementation based on best industry practices to achieve successful and high-performing projects.
Energy Storage
The most dominant technology being deployed in recent years across the electric grid are battery energy storage systems (BESSs), which interconnect to both distribution and transmission systems. A BESS is complex in nature because it utilizes numerous battery cells connected in series and parallels to build a medium-voltage DC system (emerging at or above 1000 V) at high energy capacity behind a bi-directional inverter to enable power exchange with a 60 Hz electric grid. Such a complex DC+AC system requires a myriad of control functions and protection schemes to supervise the power conversion mechanism and to ensure safety and integrity in grid interconnection and operation. Special attention should be given to design, engineering, and implementation of BESS projects by applying state-of-the-art engineering knowledge and well-utilized industry best practices.

Why Danovo Energy Solutions
Danovo Energy Solutions has engaged and acted as part of the design, engineering, and implementation teams for several state-of-the-art large BESS projects connecting to T&D systems. Our hands-on experience and direct involvement in all steps of selecting, designing, and integrating the technology into a utility environment has been extremely valuable. We have helped customers schedule, budget, and achieve success in their projects, saving them time and resources. The experts at Danovo Energy Solutions are actively participating and leading the development of industry standards and recommended practices for energy storage systems with IEEE, Cigre, IEC, and local jurisdictions (NERC/FERC/NFPA, etc.). These activities give us the knowledge of industry best practices and lessons learned from a multitude of projects offering best advice and practical solutions to our customers.
Contact us to learn more about Field Testing of Energy Storage